Several months ago (August,
October,
November), I started renovating the bathroom. Then life happened, things were hectic at work for a while, and I didn't touch the bathroom renovation project for a few months. But now it looks like I'll have a bit of free time on my hands, so I plan on finishing the bathroom.
- 2013-02-07: Started the painting today. Trim is all finished. Went out this afternoon and purchased the brown I need for the walls. Tomorrow I should have everything ready to start painting the walls.
- 2013-02-08: Finished painting the walls.
- 2013-02-10: Installed towel bars and something to obscure the window (compare with the previous picture).
- 2013-02-10: Setup the tile saw outside and spent the afternoon and early evening making all the cuts I need. Nothing has been cemented down yet. Note the condensation as I was cuting. Had to keep refilling the saw with extremely hot water cause ice was forming around the saw.
- 2013-02-11: Floor tiles are now cemented down.
- 2013-02-12: Front of the tub has been cut and is now in place.
- 2013-02-13: Grout is done (though the tiles still need to be cleaned and the grout sealed in this picture).
- 2013-02-15: The toilet is in place, and a new shower bar + curtain are installed.